True Standard of Performance is measured by client satisfaction, not by profit and risk avoidance

Entergy Administration Building

  • place-holder
  • place-holder
  • place-holder

Genesis Engineering provided the mechanical, related plumbing, and structural engineering for the building modifications required to remove the existing water-cooled chiller, cooling tower, central multizone AHU and dedicated OA AHU  and associated sub-systems and replace them with a new air-cooled chiller mounted on the roof in the location of the cooling tower and a new AHU with new VAV reheat boxes to control the existing hot-deck / cold-deck zones.

Project Information

Owner: Entergy

Location: Orange, TX

Architect: