Tropicana UFO6

Location: Bradenton, Florida
Architect: Hall Darling Design Studio

The UFO6 facility is a 50,000 SF building and is utilized for manufacturing of food-grade products. This facility includes steam-based dehumidification systems and an industrial drainage system with process settling sump and pumping stations. This project was completed utilizing the design-build project delivery method and was constructed while the existing facility remained fully operational.

READY TO CREATE A FACILITY THAT LASTS?